Date | CCH Canal CFS (cfs) | Bypass Flume CFS (cfs) | Total CFS (cfs) | Spill CFS (cfs) | CCH Canal Height (ft) | Canal Gate 1 Height (ft) | Canal Gate 2 Height (ft) | Max Canal Gate Height (ft) | Max River Gate Height (ft) | Canal Gate Height Set (ft) | River Gate Height Set (ft) | Bypass meter (cfs) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
07/20/2024 | 65.09 | 41.91 | 1.27 | -0.06 | 2.00 | 2.9 | ||||||
07/21/2024 | 84.50 | 3.90 | 1.61 | -0.06 | 1.97 | 1.1 | ||||||
07/22/2024 | 81.20 | 3.74 | 1.57 | -0.06 | 1.98 | 1.0 | ||||||
07/23/2024 | 89.50 | 3.59 | 1.67 | -0.06 | 2.17 | 0.9 | ||||||
07/24/2024 | 84.40 | 3.49 | 1.61 | -0.06 | 2.19 | 0.8 | ||||||
07/25/2024 | 81.50 | 3.38 | 1.58 | -0.06 | 2.39 | 0.8 | ||||||
Average | 81.03 | 0.00 | 10.00 | 0.00 | 1.3 | |||||||
Maximum | 89.50 | 41.91 | 2.9 | |||||||||
Minimum | 65.09 | 3.38 | 0.8 | |||||||||
Total Volume (AF) | 964.11 | 0.00 | 119.00 | 0.00 | 14.9 |