Vermillion Canal at Shaw Weir




Date Battery Voltage (V) Panel Temperature (degC) Canal Height (ft) Canal Flow (cfs)
05/14/2026 11.11 26.49 0.20 2
05/15/2026 11.14 24.71 0.20 2
05/16/2026 11.18 19.28 0.42 9
05/17/2026 11.10 14.24 0.55 12
05/18/2026 11.29 7.99 0.65 16
05/19/2026 11.41 15.84 0.60 14
Average 9
Maximum 16
Minimum 2
Total Volume (AF) 109