Vermillion Canal at Shaw Weir




Date Battery Voltage (V) Panel Temperature (degC) Canal Height (ft) Canal Flow (cfs)
06/12/2019 13.00 25.78 0.78 22
06/13/2019 13.03 25.17 0.71 18
06/15/2019 12.98 25.56 0.77 21
Average 20
Maximum 22
Minimum 18
Total Volume (AF) 121