Vermillion Canal at Shaw Weir




Date Battery Voltage (V) Panel Temperature (degC) Canal Height (ft) Canal Flow (cfs)
07/05/2025 10.97 30.17 0.42 8
07/06/2025 10.20 30.92 0.40 7
Average 8
Maximum 8
Minimum 7
Total Volume (AF) 30