Sevier River / Vermillion Canal




Date Battery Voltage (V) Canal Stage above Flume (ft) Canal Stage below Flume (ft) Canal Flow (cfs) Canal Gate Height (%) River Stage at Dam (ft) River Flow at Dam (cfs) Pond Stage at Gate (ft) Canal Stage Offset (ft) River Stage below Dam (ft) River Flow below Dam (cfs) Submergence Mossing CFS Set (cfs) Gate Set (%) Auto CFS Auto Gate Gate Warning Settle Count Gate Up Total Gate Down Total
04/14/2019 13.11 1.00 -0.37 31.7 0.65 80 0.96 97.80
04/15/2019 13.13 1.01 -0.39 32.3 0.86 124 1.11 122.00
04/16/2019 12.78 1.04 -0.38 34.2 0.91 134 1.14 126.00
04/17/2019 13.11 1.07 -0.35 35.7 0.88 126 1.10 119.70
04/18/2019 13.11 1.07 -0.37 35.5 0.77 103 1.00 103.60
04/19/2019 13.01 1.06 -0.34 35.0 0.75 100 1.03 108.90
04/20/2019 12.86 1.07 -0.31 35.7 0.92 137 1.38 169.30
Average 34.3 115 121.04 0.00
Maximum 35.7 137 169.30
Minimum 31.7 80 97.80
Total Volume (AF) 476.1 1,594 1,680.20 0.00