Rocky Ford/Willow Bend Canal




Date Battery Voltage (V) Water Height (ft) Water Height 2 (ft) Canal Flow (cfs) Canal Gate 1 Height (ft) Canal Gate 2 Height (ft) Water Flow (cfs) Canal Height (ft)
09/29/2026 12.00 23.2 6.25 -1.99 0.00 0.69
09/30/2026 12.02 19.6 6.25 -1.99 0.00 0.62
Average 21.4 0.00
Maximum 23.2 0.00
Minimum 19.6 0.00
Total Volume (AF) 84.9 0.00
Date Battery Voltage (V) Water Height (ft) Water Height 2 (ft) Canal Flow (cfs) Canal Gate 1 Height (ft) Canal Gate 2 Height (ft) Water Flow (cfs) Canal Height (ft)
10/01/2026 12.00 18.4 6.25 -1.99 0.00 0.60
10/02/2026 12.09 18.7 6.25 -1.99 0.00 0.60
10/03/2026 12.05 19.5 6.25 -1.99 0.00 0.62
10/04/2026 12.09 19.6 6.25 -1.99 0.00 0.62
Average 19.1 0.00
Maximum 19.6 0.00
Minimum 18.4 0.00
Total Volume (AF) 151.1 0.00