Leamington Canal




Date Battery Voltage (V) Canal Gate 2 Height (ft) Canal Gate 3 Height (ft) Stream Height (ft) Canal Height (ft) Stream Flow (cfs) Canal Flow (cfs) River Height (ft)
11/28/2025 0.00 0.00 0.15 1.0 0.00
11/29/2025 0.00 0.00 0.16 0.0 0.00
11/30/2025 0.00 0.00 0.16 1.1 0.00
Average 0.00 0.7
Maximum 1.1
Minimum 0.0
Total Volume (AF) 0.00 4.2
Date Battery Voltage (V) Canal Gate 2 Height (ft) Canal Gate 3 Height (ft) Stream Height (ft) Canal Height (ft) Stream Flow (cfs) Canal Flow (cfs) River Height (ft)
12/01/2025 0.00 0.00 0.16 1.1 0.00
12/02/2025 0.00 0.00 0.16 1.1 0.00
12/03/2025 0.00 0.00 0.16 1.1 0.00
12/04/2025 0.00 0.00 0.16 1.1 0.00
Average 0.00 1.1
Maximum 1.1
Minimum 1.1
Total Volume (AF) 0.00 8.7