Leamington Canal




Date Battery Voltage (V) Canal Gate 2 Height (ft) Canal Gate 3 Height (ft) Stream Height (ft) Canal Height (ft) Stream Flow (cfs) Canal Flow (cfs)
11/05/2019 13.25 -0.41 -0.57 0.96 0.02 0.00 0.0
11/06/2019 13.22 -0.42 -0.47 0.96 0.02 0.00 0.0
11/07/2019 13.24 -0.42 -0.39 0.96 0.02 0.00 0.0
11/08/2019 13.23 -0.42 -0.39 0.96 0.02 0.00 0.0
11/09/2019 13.23 -0.42 -0.40 0.96 0.02 0.00 0.0
11/10/2019 13.19 -0.42 -0.39 0.96 0.02 0.00 0.0
11/11/2019 13.22 -0.42 -0.40 0.96 0.02 0.00 0.0
Average 0.00 0.0
Maximum 0.00 0.0
Minimum 0.00 0.0
Total Volume (AF) 0.00 0.0