| Date | Battery Voltage (V) | Canal Gate 2 Height (ft) | Canal Gate 3 Height (ft) | Stream Height (ft) | Canal Height (ft) | Stream Flow (cfs) | Canal Flow (cfs) | River Height (ft) |
|---|---|---|---|---|---|---|---|---|
| 09/04/2026 | 0.00 | -0.01 | 0.19 | 1.4 | 0.00 | |||
| 09/05/2026 | 0.44 | 0.45 | 0.60 | 9.9 | 0.00 | |||
| 09/06/2026 | 0.66 | 0.69 | 0.80 | 14.0 | 0.00 | |||
| 09/07/2026 | 0.66 | 0.69 | 0.80 | 14.0 | 0.00 | |||
| 09/08/2026 | 0.66 | 0.69 | 0.80 | 14.1 | 0.00 | |||
| 09/09/2026 | 0.44 | 0.45 | 0.59 | 9.8 | 0.00 | |||
| 09/10/2026 | 0.01 | 0.00 | 0.17 | 1.1 | 0.00 | |||
| Average | 0.00 | 9.2 | ||||||
| Maximum | 14.1 | |||||||
| Minimum | 1.1 | |||||||
| Total Volume (AF) | 0.00 | 127.5 |