Canal B




Date Battery Voltage (V) Canal Flow (cfs) Canal Upstream Height (ft) Canal Downstream Height (ft) RF Signal Strength (dB) Water Level Differance (ft)
07/02/2025 55
07/03/2025 27
07/04/2025 30
07/05/2025 30
07/06/2025 30
07/07/2025 66
07/08/2025 140
Average 54
Maximum 140
Minimum 27
Total Volume (AF) 750