Canal A Control




Date Battery Voltage (V) Canal Gate Height 1 (ft) Canal Gate Height 3 (ft) Canal Gate Height 2 (ft)
05/14/2026 13.41 1.83 1.83 1.02
05/15/2026 13.66 1.84 1.84 1.02
05/16/2026 13.81 1.82 1.82 0.86
05/17/2026 13.70 1.70 1.70 0.79
05/18/2026 13.59 1.55 1.55 0.79
05/19/2026 13.31 0.94 0.94 0.78
05/20/2026 13.85 0.62 0.62 0.80
05/21/2026 13.76 0.36 0.36 0.81
Average
Maximum
Minimum
Total Volume (AF)