Canal A Control




Date Battery Voltage (V) Canal Gate Height 1 (ft) Canal Gate Height 3 (ft) Canal Gate Height 2 (ft)
06/24/2025 13.32 2.07 2.08 3.77
06/25/2025 13.77 2.08 2.08 3.75
06/26/2025 13.57 2.22 2.22 3.74
06/27/2025 13.10 2.14 2.14 3.72
06/28/2025 12.85 2.39 2.39 3.75
06/29/2025 12.81 2.38 2.38 3.74
06/30/2025 12.89 2.30 2.30 3.73
Average
Maximum
Minimum
Total Volume (AF)
Date Battery Voltage (V) Canal Gate Height 1 (ft) Canal Gate Height 3 (ft) Canal Gate Height 2 (ft)
07/01/2025 12.98 2.14 2.14 3.70
Average
Maximum
Minimum
Total Volume (AF)