Canal A Control




Date Battery Voltage (V) Canal Gate Height 1 (ft) Canal Gate Height 3 (ft) Canal Gate Height 2 (ft) Canal Flow (cfs) Canal Height H of A (ft) Canal Height H of B (ft)
11/05/2019 12.41 0.00 0.00 -0.75 0 0.30 0.29
11/06/2019 12.42 0.00 0.00 -0.81 0 0.28 0.29
11/07/2019 12.46 0.00 0.00 -0.82 0 0.28 0.29
Average 0
Maximum 0
Minimum 0
Total Volume (AF) 0