Abraham Canal at Head




Date Battery Voltage (V) CFS_SET (cfs) Auto CFS Water Upstream Head (ft) Water Downstream Head (ft) Canal Flow (cfs) Canal Gate Height 1 (ft) Gate 1 Warning Communication Tries Communication Fails Current Fails Gate Opening (ft)
08/18/2019 13.2 1.29 0.35 82 2.24
08/19/2019 13.1 1.37 0.54 91 2.44
08/20/2019 13.2 1.36 0.47 90 2.42
08/21/2019 13.1 1.30 0.43 84 2.32
08/22/2019 13.1 1.15 0.47 69 1.96
08/23/2019 13.3 1.06 0.47 61 1.68
08/24/2019 13.2 1.01 0.28 57 1.56
08/25/2019 13.2 0.95 0.54 51 1.39
Average 0.00 73
Maximum 91
Minimum 51
Total Volume (AF) 0.00 1,160