Abraham Canal at Head




Date Battery Voltage (V) CFS_SET (cfs) Auto CFS Water Upstream Head (ft) Water Downstream Head (ft) Canal Flow (cfs) Canal Gate Height 1 (ft) Gate 1 Warning Communication Tries Communication Fails Current Fails Gate Opening (ft)
03/15/2023 13.1 -1.39 0.00 0 -0.04
03/16/2023 13.1 -1.38 0.00 0 -0.04
03/17/2023 13.2 -1.40 0.00 0 -0.04
03/18/2023 13.2 -1.43 0.00 0 -0.04
03/19/2023 13.2 -1.37 0.00 0 -0.04
03/20/2023 13.1 -1.40 0.00 0 -0.04
03/21/2023 13.2 -1.43 0.00 0 -0.04
03/22/2023 13.2 -1.47 0.00 0 -0.04
Average 0.00 0
Maximum 0
Minimum 0
Total Volume (AF) 0.00 0