Abraham Canal at Head




Date Battery Voltage (V) CFS_SET (cfs) Auto CFS Water Upstream Head (ft) Water Downstream Head (ft) Canal Flow (cfs) Canal Gate Height 1 (ft) Gate 1 Warning Communication Tries Communication Fails Current Fails Gate Opening (ft)
06/12/2019 13.2 0.77 0.01 38 0.84
06/13/2019 13.2 0.79 0.00 39 0.86
06/14/2019 13.2 0.81 0.00 40 0.91
06/15/2019 13.3 0.80 0.00 40 0.92
06/16/2019 13.2 0.82 0.00 41 1.00
06/17/2019 13.4 0.86 0.01 44 1.10
06/18/2019 13.3 1.12 0.29 78 1.86
06/19/2019 13.3 1.26 0.44 96 2.27
Average 0.00 52
Maximum 96
Minimum 38
Total Volume (AF) 0.00 825