C719 Diversion




Date Battery Voltage (V) Gauge Height (ft) Canal Flow (cfs) Gate 1 Height (ft) Gate 2 Height (ft) Pond (ft) Pond Height (ft) Pond Battery Voltage (V) Pond RF Signal (db) Call Fails Total Fails Tries Auto Pond Pond Set (ft) Gate 1 Warning Gate 2 Warning Gate 1 Up Total Gate 1 Down Total Gate 2 Up Total Gate 2 Down Total Settle Count Auto CFS CFS Set (cfs)
06/24/2025 13.1 0.40 10.03 0.53 -0.01
06/25/2025 13.1 0.38 9.13 0.39 -0.01
06/26/2025 13.1 0.38 9.25 0.50 -0.01
06/27/2025 13.0 0.40 10.04 0.68 -0.01
06/28/2025 13.0 0.40 10.02 0.82 -0.01
06/29/2025 13.0 0.40 10.02 0.80 -0.01
06/30/2025 13.0 0.40 10.01 0.78 -0.01
Average 9.79 0.00
Maximum 10.04
Minimum 9.13
Total Volume (AF) 135.84 0.00
Date Battery Voltage (V) Gauge Height (ft) Canal Flow (cfs) Gate 1 Height (ft) Gate 2 Height (ft) Pond (ft) Pond Height (ft) Pond Battery Voltage (V) Pond RF Signal (db) Call Fails Total Fails Tries Auto Pond Pond Set (ft) Gate 1 Warning Gate 2 Warning Gate 1 Up Total Gate 1 Down Total Gate 2 Up Total Gate 2 Down Total Settle Count Auto CFS CFS Set (cfs)
07/01/2025 13.0 0.40 10.05 0.78 -0.01
Average 10.05 0.00
Maximum 10.05
Minimum 10.05
Total Volume (AF) 19.93 0.00