Joes Valley Reservoir Control




Date Battery (V) Panel Temperature (degC) Water Release (cfs) Building Temp. (degF) Gate 1 (ft) Gate 2 (ft) Gate 3 (ft)
05/14/2026 13.10 19.47 120.10 57 0.36 0.36 -0.49
05/15/2026 13.10 18.11 120.10 56 0.36 0.36 -0.49
05/16/2026 13.10 18.54 120.20 56 0.36 0.36 -0.49
05/17/2026 13.10 18.68 120.20 56 0.36 0.36 -0.49
05/18/2026 13.09 16.04 120.20 54 0.36 0.36 -0.49
05/19/2026 13.08 12.97 103.20 51 0.30 0.30 -0.49
05/20/2026 13.08 11.39 84.90 50 0.25 0.24 -0.49
Average 112.70
Maximum 120.20
Minimum 84.90
Total Volume (AF) 1,564.39