Joes Valley Reservoir Control




Date Battery (V) Panel Temperature (degC) Water Release (cfs) Building Temp. (degF) Gate 1 (ft) Gate 2 (ft) Gate 3 (ft)
09/29/2026 13.10 17.18 27.83 61 0.11 0.01 2.05
09/30/2026 13.09 16.05 7.06 60 -0.01 0.01 1.21
Average 17.45
Maximum 27.83
Minimum 7.06
Total Volume (AF) 69.19
Date Battery (V) Panel Temperature (degC) Water Release (cfs) Building Temp. (degF) Gate 1 (ft) Gate 2 (ft) Gate 3 (ft)
10/01/2026 13.09 16.69 34.33 61 0.18 0.01 1.21
10/02/2026 13.10 18.11 42.49 62 0.24 0.01 1.21
10/03/2026 13.10 18.34 42.47 62 0.24 0.01 1.21
10/04/2026 13.10 18.42 42.45 62 0.24 0.01 1.21
10/05/2026 13.10 19.00 42.43 63 0.24 0.01 1.21
Average 40.83
Maximum 42.49
Minimum 34.33
Total Volume (AF) 404.87